Airoli-Katai Naka Freeway’s Second Phase Estimated to be Completed in 2024

By Lodha

August 11, 2025

Will reduce travel time from Mulund to Palava to 30 mins

The Airoli-Katai Naka Freeway is not just an infrastructural marvel but a transformative project for the Navi Mumbai - Palava - Kalyan region. As per the latest report, Phase 1 and Phase 2 of the project is expected to be completed by December 2024. Once ready, the 12 km long Airoli-Katai Naka Freeway will provide direct and quick access to people travelling from Mumbai to Kalyan and the Badlapur region. This freeway will significantly decongest heavy traffic, enhancing connectivity and bringing Palava closer to Mumbai, cutting travel time significantly.

Additionally, the work on the Palava Junction flyover will now be fast-tracked owing to the approval from Central Railway. This development will further alleviate traffic flow and provide a seamless route into Palava.

The Airoli-Katai Naka Freeway is being constructed in three phases:

  • Phase 1: A link between Thane-Belapur Road and NH48 (old NH 4) via a 1.7 km twin tunnel through Parsik Hill.

  • Phase 2: An elevated road connecting Airoli Bridge to Thane-Belapur Road.

  • Phase 3: A direct connection between NH48 and Katai Naka via an elevated road.

The Airoli Katai Naka elevated road map aims to enhance connectivity, benefiting nearby areas like Palava, which will be 20 minutes to Airoli and 30 minutes to Mulund.

Snapshot of work in progress of Airoli Katai Naka road:

Phase 1: 

  • The elevated road connecting Thane-Belapur Road to the Airoli side of the Parsik Hill twin tunnel is complete

  • Work is currently underway on the Kalsekar side of the Parsik Hill Twin Tunnel and the connecting road

  • NH48 end of Phase 1 is nearing completion 

Phase 2: 

  • The Airoli Bridge connection work is nearing completion

  • Girder erection in progress to link Phase 2 with Phase 1 near the Thane-Belapur end

With these enhancements, the Airoli Katai Naka tunnel latest news indicates a transformative impact on commuting times and regional connectivity. Additionally, the upcoming Airoli Katai Tunnel opening date is eagerly anticipated by residents and businesses alike, as it promises a more efficient transportation network.

Airoli Katai Naka Freeway Phase 3 which is yet to commence will further solidify this infrastructure's role in the Navi Mumbai - Palava - Kalyan region, improving access to key locations and boosting real estate prospects.

Palava: A Key Beneficiary of the Airoli-Katai Naka Freeway

Palava, spread over 5,000 acres, is already home to world-class amenities and residential projects. With the upcoming freeway, the area is set to benefit tremendously from enhanced connectivity, making it even more attractive for homebuyers and investors. The Palava Junction Flyover will provide traffic-free access into Palava, further easing the commuting experience for its residents.

Additionally, Palava City by Lodha offers homes that cater to diverse needs, alongside a host of facilities like world-class educational institutions, a sports complex with an Olympic-sized pool, a 5 lakh sq. ft. Xperia Mall, and much more.

As the Airoli-Katai Naka Tunnel Road nears completion, the region’s real estate market is set for an exciting phase of growth. The benefits of faster commutes, enhanced infrastructure, and better connectivity make this a highly anticipated project for both developers and residents

Discover the latest updates on the Airoli-Katai Freeway progress.

You may also like

Blog Infrastructure & Connectivity
Palava Secures Additional Water Supply From Midc

By Lodha

Read More
Blog Sustainability
Palava City - A Greenfield Smart City Project In Dombivli

By Lodha

Read More
Blog Lodha Life
Palava City: A Home That Offers Purposeful Living For Senior Citizens!

By Lodha

Read More

Recent Blogs

Blog Infrastructure & Connectivity
The Future of Well-Connected Urban Living: Why Palava is the Best…

By Palava

Read More
Blog Lodha Life
Palava through my eyes: A senior citizen’s reflection

By Lodha

Read More
Blog Neighbourhood Guides
Smart Cities - The Future Of Urban Development

By Lodha

Read More
  • Home
  • Blog
  • Airoli-Katai Naka Freeway’s Second Phase Estimated to be Completed in 2024
Closed

Request a call back

+91